Take exit 7A [MAP]
for Pine Forest Rd toward Pensacola N.A.S. (0.2 miles)
Merge onto Pine Forest Rd (Signs for Pensacola N.A.S.) (128 ft)
Slight right toward Wild Lake Blvd (443 ft)
Turn right onto Wild Lake Blvd (1.0 miles)
Turn left at Klondike Rd (1.6 miles)
Turn right at US 90 (Mobile Hwy) (1.1 miles)
Turn right at Jamesville Rd (0.6 miles) The field is at the end of the
road, through the gate
FROM TALLAHASSEE, FL:
Take I-10 West to Pensacola.
Take exit 7 [MAP]
for Pine Forest Rd toward FL-297/Pensacola N.A.S. (0.2 miles)
Keep Left at the fork, follow signs for Pensacola N.A.S. (449 ft)
Turn left at Pine Forest Rd (0.1 miles)
Slight right toward Wild Lake Blvd (443 ft)
Turn right onto Wild Lake Blvd (1.0 miles)
Turn left at Klondike Rd (1.6 miles)
Turn right at US 90 (Mobile Hwy) (1.1 miles)
Turn right at Jamesville Rd (0.6 miles) The field is at the end of the
road, through the gate
FROM NORTH:
Take I-65 South to exit 69. Turn East.
Follow signs to US -29 south to Pensacola.
At I-10 intersection, take I-10 West to FL-297/Pensacola N.A.S. exit
number 7.
Follow instructions "FROM TALLAHASSEE" above, #2 through 9.
UPDATE: 05FEB2010
Click Here to view the Field
Procedures. Click Here to view the
Field Safety Rules and Regulations. Click Here
to view the Updated Field Layout. Click Here to
view the Updated Runway Layout.
Phases of Construction and Improvement on the site.
PHASE ONE:
Install sod around runway*
Build Main Pavilion*
Build Covered pit area building & install in concrete*
Install conduit for wiring of pavilion and pits*
Pour concrete floor in main pavilion*
Enclose storage building area at back of pavilion*
Install trash cans*
Install carpet in floor of pit area
Install frequency pin system in pavilion*
PHASE
TWO:
Wire up pavilion for power (wire for generator use for now)*
Install ceiling fans and lighting on pavilion*
Install pilot stations and station fencing*
Install fencing at parking lot and flight line*
Pave taxiways and starting area*
Install signage on fences/gates*
Built/install start-up tables/restraints*
Built model cart for transportation of equipment from parking area to pit
area
Paint runway/taxiway lines*
Install wind sock*
PHASE THREE:
Install underground irrigation
Install sound system in pavilion*
Install sink at back of pavilion and establish concession area/building
Items that Escambia County will hopefully be financing and
installing for us.
Power to the site
Water to the site (drinking and irrigation)
Sewage facilities
Extend the parking lot and add RV hookups
Fenced play area with equipment for small children